|
|
|
Position: Production process |
|
|
![](images/scgytop-e.jpg) |
|
|
![](images/honortop2-e.jpg) |
|
|
After 20 years of unremitting efforts, the company worked out a complete and mature electric alloy production process: from the melting, rolling, drawing, heat treatment to become useful to the final stop, and with chemical analysis department, the physical inspection department, service department , the procurement of raw materials from upstream to downstream testing physical properties of the finished product inspection, to final product quality tracking, comprehensive monitoring product quality.
|
|
|
![](images/gsjjline.jpg) |
|
|
|
![](images/zxdgtop2.jpg) |
![](images/sb/1-1s.jpg) |
|
![](images/sb/1-2s.jpg) |
Melting by intermediate frequency furnace |
![](images/zxdgtop2.jpg) |
![](images/sb/3-1s.jpg) |
|
![](images/sb/3-2s.jpg) |
Re-melting of Electroslag |
![](images/zxdgtop2.jpg) |
![](images/sb/2-1s.jpg) |
|
![](images/sb/2-2s.jpg) |
Chemical analysis |
![](images/zxdgtop2.jpg) |
![](images/sb/4-1s.jpg) |
|
![](images/sb/4-2s.jpg) |
Rolledflat |
![](images/zxdgtop2.jpg) |
![](images/sb/5-1s.jpg) |
|
![](images/sb/5-2s.jpg) |
High speed continuous wire drawing |
![](images/nextp-e.jpg) |
|
|
|
|